SB 274 — Requiring the state corporation commission to engage a consulting firm to conduct a technical and legal feasibility study on new nuclear energy generation.
SB 274 (As Introduced)
As Introduced text of SB 274.
Sign in to read the full text
The document summary and details above are public. The full text is available to signed-in accounts.