States / District of Columbia / Bill text

Bill text Introduction

B 26-0446 — University of the District of Columbia Change Order No.2 to Contract No. GF 2021-C-2021 Consys Inc Approval and Payment Authorization Emergency Act of 2025

B 26-0446 (Introduction)

Introduction text of B 26-0446.

Sign in to read the full text

The document summary and details above are public. The full text is available to signed-in accounts.