States / California / Bill text

Bill text AB1658

AB 1658 — Local Agency Public Construction Act: change orders: County of Los Angeles: County of Santa Clara.

AB 1658 (AB1658)

AB1658 text of AB 1658.

Sign in to read the full text

The document summary and details above are public. The full text is available to signed-in accounts.