States / California / Bill text

Bill text AB1406

AB 1406 — Attached residential condominium sales: liquidated damages.

AB 1406 (AB1406)

AB1406 text of AB 1406.

Sign in to read the full text

The document summary and details above are public. The full text is available to signed-in accounts.