States / Maine / LD 2113

LD 2113 Failed

An Act To Align Long-Range Grid Strategy With The State Energy Plan And Strengthen Integrated Grid Planning

Introduced
In Committee
Floor
Crossed Over
Passed
Enacted

No summary has been published for this bill. The full text is on the Bill text tab.

Chamber
House
Introduced
Jan 7, 2026
Last action
Mar 18, 2026 — Pursuant to Joint Rule 310.3 Placed in Legislative Files (DEAD)
Session
132
Momentum
5 · Stalled