Electric utility distribution and transmission system facilities: undergrounding and insulation.

Introduced
In Committee
Floor
Crossed Over
Passed
Enacted

Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Under existing law, it is the policy of the state that each electrical corporation continue to operate its electric distribution grid in its service territory and to do so in a safe, reliable, efficient, and cost-effective manner.

This bill would require the commission, until January 1, 2031, to form a working group to study the cost of undergrounding and insulating overhead electric utility distribution system facilities or transmission system facilities, compile wildfire mitigation reports of electric utilities, and provide the Legislature, on or before July 1, 2027, with a plan on how to most effectively invest in undergrounding and insulating those facilities or how to otherwise support electrical corporations, as provided.

Chamber
Senate
Introduced
Feb 21, 2025
Last action
Feb 2, 2026 — Returned to Secretary of Senate pursuant to Joint Rule 56.